NACE SP0207 PDF
NACE SP0207 PDF
$43.45

NACE SP0207 PDF

   0 reviews
Product Code:
Availability:
product
In Stock
$43.45 $79.00
IN TAX $43.45
Ask about this product

Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines

Published byPublication DateNumber of Pages
NACE03/10/200751

NACE SP0207 – Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines

This standard practice presents procedures for performing close-interval direct current (DC) structure-to-electrolyte potential surveys, DC surface potential gradient surveys, and hybrid surveys such as trailing-wire direct current voltage gradient (DCVG) surveys or intensive measurement surveys, on buried or submerged metallic pipelines. This standard is maintained by Task Group 279.

Reviews (0)

   0 reviews
Write a review