NACE SP0207 PDF
Product Code:
Availability:
Availability:
product
In Stock
In Stock
$43.45
$79.00
IN TAX $43.45
IN TAX $43.45
Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines
Published by | Publication Date | Number of Pages |
NACE | 03/10/2007 | 51 |
NACE SP0207 – Performing Close-Interval Potential Surveys and DC Surface Potential Gradient Surveys on Buried or Submerged Metallic Pipelines
This standard practice presents procedures for performing close-interval direct current (DC) structure-to-electrolyte potential surveys, DC surface potential gradient surveys, and hybrid surveys such as trailing-wire direct current voltage gradient (DCVG) surveys or intensive measurement surveys, on buried or submerged metallic pipelines. This standard is maintained by Task Group 279.
Reviews (0)