IEEE 415 PDF
Availability:
In Stock
IN TAX $28.60
IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations
Published by | Publication Date | Number of Pages |
IEEE | 12/09/1985 | 16 |
IEEE 415 – IEEE Guide for Planning of Preoperational Testing Programs for Class 1E Power Systems for Nuclear Power Generating Stations
Revision Standard – Inactive-Withdrawn.Directions for establishing an acceptable pre-operational testing program for Class 1E power systems in nuclear power generating stations are provided. The pre-operational tests are performed after the appropriate construction tests have been completed. Their purpose is to verify that the Class 1E power systems perform their required function as designed. The power systems are considered to include the ac and dc power supplies, but do not include the equipment that utilizes the power.
Reviews (0)