ASTM F2019 PDF
ASTM F2019 PDF
$30.80

ASTM F2019 PDF

   0 reviews
Product Code:
Availability:
product
In Stock
$30.80 $56.00
IN TAX $30.80
Ask about this product

Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic Cured-in-Place (GRP-CIPP) Using the UV-Light Curing Method

Published byPublication DateNumber of Pages
ASTM01/01/202013

ASTM F2019 – Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled inPlace Installation of Glass Reinforced Plastic Cured-in-Place(GRP-CIPP) Using the UV-Light Curing Method

1.1 This practice covers the procedures for the reconstruction of pipelines and conduits (4 to 72 in. (100 to 1830 mm) diameter) by the pulled-in place installation of a resin-impregnated, glass fiber tube into an existing pipe or conduit followed by its inflation with compressed air pressure (see Fig. 1) to expand it firmly against the wall surface of the host structure. The photo-initiated resin system in the tube is then cured by exposure to ultraviolet (UV) light. When cured, the finished cured-in-place pipe will be a continuous and tight fitting pipe within a pipe. This type of reconstruction process can be used in a variety of gravity flow applications such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems.

FIG. 1 UV Cured-In-Place Pipe Installation Method (Air/Steam)

Reviews (0)

   0 reviews
Write a review