ASTM F1743 PDF
Availability:
In Stock
IN TAX $29.70
Standard Practice for Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)
Published by | Publication Date | Number of Pages |
ASTM | 11/01/2021 | 8 |
ASTM F1743 – Standard Practice forRehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)
1.1”This practice describes the procedures for the reconstruction of pipelines and conduits (2”’in. to 96 in. (5”’cm to 244 cm) diameter) by the pulled-in-place installation of a resin-impregnated, flexible fabric tube into an existing conduit and secondarily inflated through the inversion of a calibration hose by the use of a hydrostatic head or air pressure (see Fig. 1). The resin is cured by circulating hot water, by the introduction of controlled steam into the tube, or by photoinitiated reaction. When cured, the finished cured-in-place pipe will be continuous and tight fitting. This reconstruction process may be used in a variety of gravity and pressure applications such as sanitary sewers, storm sewers, process piping, electrical conduits, and ventilation systems.
FIG. 1 Cured-in-Place Pipe Installation Methods
Worldwide Standards PDF © 2024
Reviews (0)