ASAE/ASABE EP492.1 PDF download
Product Code:
Availability:
Availability:
product
In Stock
In Stock
$41.25
$75.00
IN TAX $41.25
IN TAX $41.25
Planning, Design and Construction of Diversions
Published by | Publication Date | Number of Pages |
ASAE/ASABE | 04/01/2014 | 7 |
ASAE/ASABE EP492.1 – Planning, Design and Construction of Diversions
This standard applies where concentrated surface flow, non-concentrated surface flow, or shallowsubsurface flow is a problem, can be intercepted by a shallow channel and a suitable outlet exists. Soil and siteconditions must be suitable to build earth channels and earth ridges and sediment accumulations must bemanageable.
Reviews (0)