AASHTO TF28-1 PDF download
Product Code:
Availability:
Availability:
product
In Stock
In Stock
$22.00
$40.00
IN TAX $22.00
IN TAX $22.00
Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications
Published by | Publication Date | Number of Pages |
AASHTO | 01/01/1990 | 56 |
AASHTO TF28-1 – Guidelines and Guide Specifications for Using Pozzolanic Stabilized Mixture (Base Course or Subbase) and Fly Ash for In-Place Subgrade Soil Modifications
Contains the following subsections:
- Guidelines for Usage of Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
- Guide Specification for Pozzolanic Stabilized Mixture (PSM) Base Course or Subbase,
- Guidelines for Use of Fly Ash for In-Place Subgrade Soil Modification,
- and General Contract Specifications for Acceptance of Fly Ash by a State Highway Agency.
Reviews (0)